James' Bridge, Dingwall Nr Inverness
The new 26m x 1.5m bridge with Galvanised steel beams and a hardwood Type A parapet provides a durable and robust structure to replace the former footbridge that was shut to pedestrians in 2017.
Read more
Brookes Mill, Huddersfield - ref 4526
A 13.7m x 1.5m footbridge was required to link two car parks at the Heritage Office Park in Armitage Bridge, Huddersfield.
Read more
New Cycle Bridge on Affric Kintail Way, Inverness-shire
The 8m long x 1.8m wide footbridge has a 1.4m high Post and 4 rail parapet for cycleway use. The Hi-Grip Excel deck with non slip inserts provides a perfect slip resistant surface for both pedestrians and cyclists.
Read more
Bridge and Stairs at Dixons Trinity Academy, Leeds - Ref 4658
CTS Bridges have recently completed installation of a new 26.65m x 2.45m Steel Vierendeel Through truss bridge at Dixons Trinity Academy, Leeds for Willmott Dixon.
Read moreCapital Quarter, Cardiff - Job 4549
A curved in plan bridge installed at new luxury student accommodation Capital Quarter, Cardiff
Read more
Monet style footbridge - 4618
This softwood Monet style bridge was delivered to a private customer in Devizes, Wiltshire.
Read more
Banff Links Caravan Park Bridge - Ref 4568
Completed 6 days ahead of schedule this 2 span hardwood footbridge was the result of excellent teamwork between CTS Bridges and their client (Aberdeenshire Council), the foundation contractors and the caravan park owners.
Read more
Bespoke structures at Barton Park, Oxford
CTS were approached to design, manufacture and install a number of bespoke structures at Barton Park, Oxford.
Read more
Making Waves at Rossall Coastal Defence Ecology Park
Artist Stephen Broadbent was responsible for the design of the Mythic Coast inspired park and the wave effect bridge parapets were part of his concept for the scheme.
CTS's Structural Engineers and in-house timber specialists worked closely with main contractor Balfour Beatty and Broadbent Studios to develop the concept into a buildable solution.
Read more
Bespoke bridge for new Travelodge, Bury St Edmunds
The new Travelodge at Bury St Edmunds required a footbridge over a large drainage ditch to enable customer to access their car park. Marshall Building Contractors were the main contractor on the scheme and approached CTS Bridges to provide the bridge.
Read moreFRP Bridge in Poole, Dorset
CTS Bridges supplied a 5.8m long x 1.2m wide FRP footbridge to Avon Construction who installed the bridge onto their abutments for Borough of Poole Council in Swanage, Poole, Dorset.
Read more

CTS win Tekla Award for Finzels Reach Bridge
The entries submitted into the Infrastructure category were judged on complexity, attention to detail, disciplines used, innovation, impressiveness of structure and the software used.
Read more